Transformer substation, Madrid-Barajas Airport T2
New transformer substation at Terminal 2 of Madrid-Barajas airport.
Have been installed: medium voltage switchgear for normal and energency network of the airport, 6 transformers of 1600 KVA and was performed the integration of the new transformer substation in the power management system of the airport.